FAQ
-
Q Mirror Coating Operation ProcessOperation (three-coat & three -bake)
A. Metal → coating pre-treatment
(First coat) primer coating →
(first bake) baking temperature: 160 ° C-180 ° C
(Second coat) Nanometer Silver Coating(NSC) K1, water, K2, water, AB, water S, water
→ (second bake) baking 100 ° C
(Third coat) metal topcoat → (third bake) baking 160 ° C-180 ° C
B. Plastic → removing oil and static
(First coat) PU primer coating → (first bake) baking temperature: 70 ° C
(Second coat) Nanometer Silver Coating(NSC) K1, water, K2, water, AB, water S, water
→ (second bake) baking 70 ° C
(Third coat) PU topcoat → (third bake) baking 70 ° C
C. Wood → drying and sealer
(First coat) PU primer coating → (first bake) baking temperature: 50 ° C
(Second coat) Nanometer Silver Coating(NSC) K1, water, K2, water, AB, water S, water
→ (second bake) baking 50 ° C
(Third coat) PU topcoat → (third bake) baking 50 ° C